FAQ
Q1. Are you a factory or trade company?
We are a factory located in Foshan, China. Welcome to visit our factory.
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, assembly, and surface treatment.
Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.